Previous post
Posted on: 8 June 2017
Author: Corbel
[et_pb_section bb_built=”1″ admin_label=”section”][et_pb_row admin_label=”row” background_position=”top_left” background_repeat=”repeat” background_size=”initial”][et_pb_column type=”4_4″][et_pb_text admin_label=”Text” _builder_version=”3.0.49″ background_layout=”dark” text_orientation=”left” border_style=”solid”]
Some of the furniture has started to arrive for the new Disaster Recovery site. Hurrah!
We’re going to continue the them of keeping the furniture “Corbel coloured” as we have done in our other two DR suites. There’s a lot of work still to be done but at least things are beginning to take shape and once the furniture is in place in each area the who site will be transformed. More cabling is still being installed and outside connectivity should be going in pretty soon now.
Watch this space!
[/et_pb_text][et_pb_gallery admin_label=”Gallery” _builder_version=”3.0.49″ posts_number=”3″ show_title_and_caption=”on” show_pagination=”off” fullwidth=”off” orientation=”landscape” zoom_icon_color=”#2ea3f2″ hover_overlay_color=”rgba(255,255,255,0.9)” background_layout=”dark” border_style=”solid” auto=”off” gallery_ids=”3084,3083,3082″ title_font_size=”1″ /][/et_pb_column][/et_pb_row][/et_pb_section]
Previous post
Next post